New Building ConstructionThe $75 million facility supports leading-edge teaching, research, and service activities and features three interconnected buildings with a medicinal garden.
Click on a camera name and location to view the camera. Note: Cameras 4 and 5 require Internet Explorer.
|
Click here to see the archive of construction photos
![]() |
Location The new pharmacy building will be located in the North District of the Kingston Campus. It will interconnect with the north sides of Tyler and Woodward Hall. The north side of the building will face out onto a new quad which will be situation where BISC is currently located. The south side will look over a new medicinal garden which will be located in the space between Woodward and Tyler Halls.
|
West End of the New Pharmacy Building This view shows the west end of the new Pharmacy building. The main entrance is located at the overhang visiable at the end of the building. The connectors to Tyler Hall (background) and Woodward Hall (foreground) are are also show.
|
North Side View of the Main Entrance to the New College of Pharmacy Building This view shows the main entrance to the New College of Pharmacy building as seen from the north. One of the building's public spaces can been seen just inside the entrance.
|
![]() |
Medicinal Garden and South Side This view shows the south side of the building between Woodward and Tyler Halls. The area between the three interconnected buildings will feature a medicinal garden. The south side of the Pharmacy building has three neighborhoods visible through the glass. Each of these neighborhoods is a two story space that interconnects the building's four above ground floors. |
Construction Camera |
|
Located on CBLS looking at the construction site from the north
Located on Tyler looking at the construction site from east to west
Located on Woodward looking at the construction site from the south.
Live Cam 4 - Chafee
Live Cam 5 - Coastal |